Water/Wastewater Projects

MAAK has designed and implemented many water/wastewater systems. Some of these projects are described below:
Matura Water Treatment Plant (WTP)
MAAK Technologies is part of a design/build team to develop the new Matura Water Plant. The plant will treat raw water from the Matura River in the eastern part of Trinidad. View project sheet
Navet Distribution Network
MAAK Technologies provided detailed design engineering for the upgrades of the distribution systems that are connected to the Navet Trunk Main. View project sheet
Navet Trunk Main Replacement
MAAK Technologies determined the most feasible route for the replacement of the Navet Trunk Main, and produced preliminary designs and tender documents for a design/build contract. View project sheet
City of Toronto Process Control System (PCS)
MAAK designed and implemented a new Process Control System (PCS) for a large municipal Water Transmission System. View project sheet
Transmission Operations Optimizer Study
The current operations provide the water delivery/service requirements in a cost effective and uninterrupted manner. However, the complexity of the water system presents potential opportunities for optimizing operations. View project sheet
Remote Access Control (RAC)
MAAK provided remote access to the in-plant SCADA systems at the treatment facilities. View project sheet
Orillia Water Filtration Plant (WFP) Upgrade
MAAK carried out preliminary and detailed design as well contract administration for upgrades to the control system for a water filtration plant (WFP). View project sheet
Casino Rama Sewage Treatment Plant (STP)
MAAK designed and supplied the automation/SCADA system for a sewage treatment plant serving a First Nation community located northeast of Orillia, Ontario. View project sheet
Casino Rama Water Treatment Plant (WTP)
MAAK carried out preliminary and detailed design as well contract administration for upgrades to the control system for a water treatment plant (WTP), serving a First Nation community located northeast of Orillia, Ontario. The project was concerned with plant expansion and a complete upgrade of the Instrumentation, Control and SCADA system of the entire plant. View project sheet
Region of York North Wastewater Upgrades
MAAK designed and supplied automation/SCADA systems for five sewage pumping stations for a large regional municipality. The upgrades included the fabrication and installation of new control panels, a local operator interface terminal (OIT) and integration with the existing SCADA system, including all software development. View project sheet
Trinidad and Tobago Operation Control Centres
MAAK carried out the design of a SCADA system for the entire water system. The SCADA system, initially designed for approximately 120 remote nodes (water supply and transmission), will have the capability to include over 600 nodes ultimately. View project sheet
Courland Water Treatment Plant (WTP)
MAAK designed and supplied the automation system for the water plant on the island of Tobago. The plant consists of Raw Water Intake Pumps, Flocculation Tanks, Clarifiers, Filters, Clear Well, Plant Discharge Pumps, and various Chemical Systems. View project sheet
Hamilton-Wentworth 6B Pumping Station
MAAK designed and developed software for the large water pumping station. The automation system includes significant advances in pumping system control. The facility is unmanned, with operation and control integrated into the overall Regional SCADA System. View project sheet
Lake Simcoe Water Pollution Control Plant (WPCP)
MAAK designed and developed the software for the automation system for a water pollution control plant with a design flow of 4,500 m3/d. View project sheet
Conlin Road Pumping Station
MAAK carried out preliminary and detailed design as well contract administration for the automation system for a pumping station. The Conlin Road station is a wet well/dry well configuration sanitary sewage pumping station. View project sheet